  • CFMA Ford Mazda Changan - paint shop

    Completion and commissioning of body transfer control system software in CFMA Ford Mazda Changan car plant paint shop, China. The project covered  45% of the total implementation.

  • Changan, China – paint shop

    Completion of wiring design of body transfer control system for CP3 Mazda Ford Changan plant in China.  The project covered 30 % of the whole implementation

     

  • Coke plant of Częstochowa Steel works

    Software development and commissioning of railroad cars tippler control system for Coke plant in Częstochowa Steel works.

  • Częstochowa Steel works - Częstochowa

    Completion and commissioning of two pusher-type furnaces control systems designs together with evaporator cooling system in Częstochowa Steelworks. 

    Control by means S7 400 drivers. iFix package visualization.

     

  • Częstochowa Steel works - Częstochowa

    Completion of an overall design of hardening furnace control system in Częstochowa steel works. 

    Completion of S7-400 driver and HMI visualization station software development.

     

  • Ford Mexico – paint shop

    Software design of the overall control system of car body transfer
    at Hermosillo Ford car plant in Mexico
    The project covered 60% of the total implementation.
    Period of implementation: 09.2019 to 02.2020